Comprehensive Analysis of Geothermal Exploration Opportunities in Yemen: Prospects and Challenges


Comprehensive Analysis of Geothermal Exploration Opportunities in Yemen: Prospects and Challenges

Executive Summary

The exploration of geothermal resources in Yemen represents a significant opportunity for sustainable energy development in a region facing severe energy security challenges. Based on available research and conference findings, Yemen possesses substantial geothermal potential due to its unique geological positioning within active tectonic boundaries and volcanic zones. This analysis examines the viability of geothermal energy development in Yemen, drawing on technical studies presented at the Second African Rift Geothermal Conference (ARGeo-C2) and subsequent research. While Yemen's geothermal prospects are promising, realizing this potential requires addressing substantial technical, financial, and political challenges. The country's estimated geothermal capacity of approximately 30,000 MW represents one of the highest in the Middle East region, yet remains almost entirely untapped due to decades of political instability and underinvestment in energy infrastructure.











1 Yemen's Geothermal Potential and Geological Advantages

Yemen's geological characteristics make it exceptionally suitable for geothermal energy development. The country is located at the intersection of several tectonic features, including the Red Sea Rift, the Gulf of Aden, and the Arabian Plate boundary, creating ideal conditions for geothermal activity. The western and central regions of Yemen, particularly the Yemen Volcanic Plateau (YVP), show significant promise due to widespread Quaternary volcanism, thermal springs, and fumaroles. Research indicates that the Dhamar region in central Yemen hosts a particularly promising geothermal system characterized by a shallow thermal anomaly located between two active rhyolitic volcanoes .

  • Confirmed Resources: Scientific missions conducted in 2001 and 2002 identified numerous thermal emergences including springs, fumaroles, and CO₂-rich gas vents throughout continental Yemen. Subsequent geochemical analysis revealed that despite tectonic activity being most pronounced along Yemen's coastal regions, the most promising geothermal anomalies are located in the central part of the Yemen Volcanic Plateau centered around Dhamar . The geothermal potential in this area is further evidenced by temperature measurements in shallow wells reaching up to 59°C at 230 meters depth, with calculated thermal gradients as high as 300°C/km in specific locations .

  • Regional Comparison: Yemen's geothermal potential stands out significantly when compared to other Middle Eastern countries. As illustrated in Figure 8 of the search results, Yemen leads the region with an estimated 30,000 MW of geothermal capacity, substantially surpassing Turkey (17,847 MW), Saudi Arabia (4,530.48 MW), Iran (2,000 MW), and the UAE (1,000 MW) . This remarkable potential remains largely untapped, unlike in neighboring countries where geothermal development has seen greater advancement despite lower inherent resources.

Table: Geothermal Potential Comparison in Middle Eastern Countries

CountryEstimated Geothermal Capacity (MW)Development StatusPrimary Utilization
Yemen30,000Exploration phaseMostly unexploited
Turkey17,847DevelopedPower generation
Saudi Arabia4,530.48DevelopingResearch & pilot projects
Iran2,000Early developmentDirect use applications
UAE1,000Research phaseLimited applications





2 Historical Exploration Efforts and Research Status

Yemen's geothermal exploration history includes several significant initiatives, though most have faced interruptions due to political instability and security concerns. The most comprehensive effort was the Yemen Geothermal Development Project (GEF Project ID 3474), implemented by the United Nations Environment Programme in cooperation with Yemen's Ministry of Water and Environment. This project aimed to accelerate exploration and development of geothermal power through identification of high-enthalpy reservoirs to increase energy access and reduce dependence on fossil fuels. Approved in 2008 with a $1 million GEF grant and $1.1 million in co-financing, the project was unfortunately cancelled in 2018 due to the ongoing conflict in Yemen .

  • Technical Assessments: Prior to the cancellation of major projects, significant technical assessments were conducted. Between 2006-2009, a scientific cooperation between the Italian Ministry of Foreign Affairs and the Yemeni Ministry of Planning and International Cooperation funded extensive geochemical prospecting in the Dhamar region . This research employed innovative methodologies based on measuring physical parameters and "tele-thermal" components (NH₄, SiO₂, and CO₂) in surface waters and shallow aquifers to identify temperature anomalies and geothermal indicators. This approach was particularly effective in Yemen's flat terrain where conventional geophysical methods faced limitations.

  • Research Publications: The body of research on Yemen's geothermal resources includes several key studies that have been presented at international conferences such as the Second African Rift Geothermal Conference held in Entebbe, Uganda in November 2008 . These studies have covered various aspects including geochemical analysis of thermal waters, geothermometric characteristics of western Yemen, and assessments of specific geothermal fields like Al-Lisi-Isbil in the Dhamar Governorate . This research has provided valuable baseline data for future exploration efforts once political stability returns to the country.












3 Challenges and Barriers to Development

3.1 Technical and Infrastructural Challenges

The development of geothermal resources in Yemen faces significant technical hurdles that must be addressed for successful exploitation. The country lacks specialized drilling equipment suitable for high-temperature geothermal wells and has limited local expertise in geothermal energy systems. Additionally, Yemen's energy infrastructure is generally underdeveloped, particularly in rural areas where many geothermal resources are located. This creates challenges in transmitting geothermal-generated electricity to population centers. The absence of a comprehensive geological database further complicates exploration efforts, as developers must conduct basic resource assessment work that in other countries would already be available through national surveys .

3.2 Financial and Investment Barriers

Geothermal development requires substantial upfront capital investment for exploration, drilling, and plant construction – typically ranging from hundreds of millions to billions of dollars depending on the project scale. Yemen's current economic situation, exacerbated by years of conflict, makes it difficult to attract the necessary investment for geothermal projects. The high risk associated with exploratory drilling, where there is no guarantee of finding commercially viable resources, further discourages private investment. International financing mechanisms like the Global Environment Facility (GEF) have shown interest, as demonstrated by the approved funding for the Yemen Geothermal Development Project, but these initiatives remain vulnerable to political instability .

3.3 Political and Institutional Challenges

Yemen's political situation represents the most significant barrier to geothermal development. The ongoing conflict has not only halted existing projects but has also made it nearly impossible to conduct field work or maintain monitoring equipment. Even before the current conflict, institutional capacity for geothermal development was limited, with weak regulatory frameworks and overlapping responsibilities between different government agencies. The cancellation of the Yemen Geothermal Development Project in 2018 highlights how political instability can derail even well-designed initiatives . Additionally, security concerns in remote areas where geothermal resources are located present practical challenges for conducting exploration activities.

4 Strategic Recommendations for Future Development

4.1 Short-Term Strategies (0-2 years)

  • Resource Assessment and Mapping: Prioritize comprehensive geothermal resource mapping using remote sensing technologies and existing geological data while field access remains limited in some areas. This should include the development of a detailed geothermal potential map identifying the most promising sites for future exploration .

  • Capacity Building and Knowledge Transfer: Establish training programs for Yemeni engineers and technicians in cooperation with countries with advanced geothermal sectors such as Kenya, Iceland, and Turkey. The United Nations University Geothermal Training Programme has experience in providing such capacity building in African Rift countries .

  • Policy Framework Development: Develop a comprehensive legal and regulatory framework for geothermal development that clarifies rights, responsibilities, and incentives for potential investors. This framework should include standardized procedures for exploration permits, environmental impact assessments, and power purchase agreements.

4.2 Medium-Term Strategies (2-5 years)

  • Exploration Drilling and Resource Confirmation: Once security conditions improve, implement a program of exploratory drilling in the most promising areas identified through preliminary assessments. The Dhamar region should be prioritized based on previous research indicating high thermal gradients and resource potential .

  • Pilot Project Development: Develop small-scale pilot projects (5-10 MW) to demonstrate the technical and economic viability of geothermal power generation in Yemen. These projects could focus on providing power to local communities to build public support and address immediate energy needs.

  • International Partnership Building: Establish cooperative agreements with countries and organizations with geothermal expertise. The African Rift Geothermal Development Facility (ARGeo) has experience facilitating such partnerships across East African countries with similar geological settings .

4.3 Long-Term Strategies (5-10 years)

  • Commercial-Scale Development: Develop utility-scale geothermal power plants in areas with proven resources, initially targeting 50-100 MW facilities that can significantly contribute to Yemen's national grid and reduce dependence on imported fossil fuels.

  • Direct Use Applications: Promote direct uses of geothermal energy for agricultural processing, greenhouse heating, aquaculture, and space heating in addition to power generation. This diversified approach can improve economic viability and community benefits.

  • Regional Energy Integration: Explore opportunities for regional energy cooperation where Yemen could potentially export geothermal electricity to neighboring countries, positioning itself as a renewable energy leader in the Arabian Peninsula.

Table: Phased Development Approach for Yemen's Geothermal Resources

PhaseTimeframeKey ActivitiesExpected Outcomes
Preparation0-2 yearsResource mapping, capacity building, policy developmentGeothermal potential atlas, trained personnel, regulatory framework
Exploration2-5 yearsExploratory drilling, pilot projects, international partnershipsConfirmed resource estimates, demonstrated technical viability
Development5-10 yearsCommercial-scale plants, direct use applications, regional integrationSignificant energy contribution, economic benefits, reduced emissions

5 Conference Insights and Knowledge Transfer Opportunities

The Second African Rift Geothermal Conference (ARGeo-C2) held in Entebbe, Uganda in November 2008 provided valuable insights relevant to Yemen's geothermal development . This conference brought together specialists from across the African Rift region and internationally to exchange information on geothermal exploration, development, and utilization. For Yemen, participation in such forums offers critical opportunities for knowledge transfer and regional cooperation .

  • Lessons from Similar Settings: Countries along the East African Rift System, particularly Kenya and Ethiopia, have developed successful approaches to geothermal exploration and development in geological settings similar to Yemen's. These include innovative exploration techniques suited to rift-related volcanism and cost-effective drilling strategies for high-temperature resources . Yemen could adapt these approaches to its own context, potentially reducing learning curves and development costs.

  • Technical Presentations: The conference featured numerous technical presentations on topics directly relevant to Yemen's situation, including geochemical studies of thermal springs, geothermal logging techniques, and case histories of geothermal field development . These papers provide valuable reference material for Yemeni researchers and policymakers planning future geothermal initiatives.

  • Financing Models: The conference addressed critical issues related to financing geothermal development in developing countries, with special focus on overcoming the hurdles faced by ARGeo member states . Understanding these financing mechanisms and risk mitigation strategies will be essential for Yemen to attract the necessary investment for its geothermal sector once political conditions stabilize.

6 Conclusion and Future Outlook

Yemen possesses significant geothermal resources that could potentially provide a substantial portion of the country's electricity needs and contribute to sustainable development. The technical studies conducted to date, particularly those focused on the Dhamar region, indicate promising resource characteristics that warrant further investigation and development . However, the current political situation remains the primary obstacle to immediate progress in geothermal exploration and development .

The comparative analysis with global trends shows that while Yemen starts from a position of significant disadvantage due to political instability, it also possesses among the best geothermal resources in the region . With the right approach combining technical preparedness, capacity building, and strategic planning, Yemen could position itself to rapidly develop its geothermal resources once conditions permit.

International cooperation and knowledge transfer will be essential components of successful geothermal development in Yemen. Learning from the experiences of other countries along the African Rift System and leveraging the expertise of organizations like the United Nations University Geothermal Training Programme can help Yemen build the necessary capacity and avoid common pitfalls . The eventual development of Yemen's geothermal resources would not only contribute to national energy security but could also serve as a catalyst for economic recovery and sustainable development in a post-conflict scenario.

Future research should focus on maintaining institutional knowledge during the current period of limited field activity, developing detailed development plans ready for implementation when conditions improve, and strengthening international partnerships that can support rapid progress once geothermal development becomes feasible again in Yemen.


References

  1. Al-Fakih, A., & Al-Khudafi, A. (2024). Unlocking the Potential of Geothermal Energy in Yemen: A Comparative Analysis with Global Trends. *Proceedings, 49th Workshop on Geothermal Reservoir Engineering, Stanford University, SGP-TR-227*.

  2. Albaroot, M., Ahmad, A.H.M., Al-Arceq, N., & Sultan, M. (2016). Tectonostratigraphy of Yemen and geological evolution: A new prospective. International Journal of New Technology and Research, 2(2), 263608.

  3. Al-Kohlani, T.A.M. (2008). Geochemistry of thermal waters from Al-Lisi-Isbil geothermal field, Dhamar governorate, Yemen. United Nations University, Geothermal Training Programme, Reports, 10, 53-76.

  4. Al-Wesabi, I., Zhijian, F., Bosah, C.P., & Dong, H. (2022). A review of Yemen’s current energy situation, challenges, strategies, and prospects for using renewable energy systems. Environmental Science and Pollution Research, 29(36), 53907–53933.

  5. Amoatey, P., Chen, M., Al-Maktoumi, A., Izady, A., & Baawain, M.S. (2021). A review of geothermal energy status and potentials in Middle-East countries. Arabian Journal of Geosciences, 14, 1-19.

  6. Chandrasekharam, D., Lashin, A., Al Arifi, N., & Al-Bassam, A.M. (2016). Red Sea Geothermal Provinces. CRC Press.

  7. Global Environment Facility (GEF). (2008). Yemen Geothermal Development Project [Project ID 3474]. Retrieved from https://www.thegef.org/projects-operations/projects/3474

  8. Heikal, M.T., Lebda, E.M.M., Orihashi, Y., & Habtoor, A. (2014). Petrogenetic evolution of basaltic lavas from Balhaf–Bir Ali Plio-Quaternary volcanic field, Arabian Sea, Republic of Yemen. Arabian Journal of Geosciences, 7, 69-86.

  9. Minissale, A., Vaselli, O., Mattash, M.A., Montegrossi, G., Tassi, F., Ad-Dukhain, A., Kalberkamp, U., Al-Sabri, A., & Al-Kohlani, T.A. (2013). Geothermal prospecting by geochemical methods in the Quaternary volcanic province of Dhamar (central Yemen). Journal of Volcanology and Geothermal Research, 249, 95-108.

  10. Qasem, A.Q.S. (2018). Applications of renewable energy in Yemen. Journal of Fundamentals of Renewable Energy and Applications, 8(1), 254.

  11. Richter, A. (2023). ThinkGeoEnergy's Top 10 Geothermal Countries 2022 - Power Generation Capacity (MW). ThinkGeoEnergy.

  12. Van der Gun, J.A.M., & Ahmed, A.A. (1995). The Water Resources of Yemen: A Summary and Digest of Available Information. Ministry of Oil and Mineral Resources, Republic of Yemen.

  13. EXPLORATION OF GEOTHERMAL RESOURCES IN YEMEN" presentation from the Second African Geothermal Conference (2008)





Comments

Popular posts from this blog

Understanding LV Earthing Systems: TT, TN, and IT Explained

Understanding LV Earthing Systems: TT, TN, and IT Explained Earthing systems are crucial for electrical safety, protecting people and equipment from faults and shocks. In low-voltage (LV) installations, the IEC 60364 standard defines three main earthing systems:  TT, TN, and IT , each with distinct characteristics and applications. This blog post explains these systems, their subtypes, and key safety considerations, referencing the attached technical screenshots for clarity. 1. Classification of LV Earthing Systems Earthing systems are identified by a  two-letter code : First Letter: Neutral Connection T (Terra)  – Neutral is  directly earthed  at the transformer. I (Isolated)  – Neutral is  not earthed  or connected via high impedance (≥1000 Ω). Second Letter: Equipment Earthing T  – Frames are  locally earthed , independent of the neutral. N  – Frames are  connected to the neutral , which is earthed at the transformer. 2. Typ...

Understanding Short-Circuit Analysis with ETAP and the IEC 60909 Standard

U nderstanding Short-Circuit Analysis with ETAP and the IEC 60909 Standard Introduction: Short-circuit analysis is a critical aspect of electrical power system design and safety. It involves calculating the magnitude of fault currents to ensure the proper selection of protective devices and to verify that equipment can withstand fault conditions. This post will discuss how ETAP software performs short-circuit analysis in compliance with the IEC 60909 standard, a key standard in this field. Why is IEC 60909 Important? The IEC 60909 standard provides a globally recognized framework for calculating short-circuit currents in AC power systems. [Ref: IEC 60909-0:2016] Its importance stems from several factors: Ensuring Safety: Accurate short-circuit calculations, as mandated by IEC 60909, are crucial for selecting appropriately rated protective devices (circuit breakers, fuses) that can safely interrupt fault currents. [Ref: Short Circuit Analysis (IEC 60909 Standard) : Extent & Requir...

Understanding Short-Circuit Calculations in Electrical Systems

U nderstanding Short-Circuit Calculations in Electrical Systems Introduction: Short-circuit calculations are fundamental to the design, protection, and safety of electrical systems. Determining the magnitude of fault currents allows engineers to select appropriate protective devices (like circuit breakers and fuses), ensure equipment can withstand fault conditions, and ultimately safeguard personnel and property. This post will explore some of the key equations, formulas, and underlying principles involved in these crucial calculations. Key Concepts and Equations: When performing short-circuit calculations, several factors and formulas come into play. Here are some essential ones: Transformer Impedance: It's important to note that transformer impedance is often based on the transformer's self-ventilated rating (e.g., the OA base is used for ONAN/ONAF/OFAF transformers). Voltage Notation: Throughout these calculations, line-to-line voltage in kilovolts is represented as (kV)...